rod el axis bridge

Rod el Farag Axis Bridge

Cairo
More than one million cubic meters of concrete was used to build the bridge, which was used in the bridge decking, girders, and six 92 m (302 ft) tall concrete towers that support 160 steel support cables. One of the key challenges for the bridge designers was how to adequately protect the critical concrete structures from the effects of air pollution and the moist riverine environment.
 
  • Xypex Catalogue

    Xypex Catalogue

    This digital catalogue contains an overview of the company, the products, CSI Format, Schematic Drawings, an array of projects worldwide and much more.

    Note: This is a large file and may take longer to download depending on your internet connection.

  • tn-brochure

    Xypex Corporate Brochure

    Discover how, for over 50 years, Xypex crystalline waterproofing technology has been serving concrete users in over 90 countries.
  • tn-no-equal

    No Equal

    This brochure is a collection of some of our Scanning Electron Microscopy (SEM) Imagery giving definitive evidence of a non-soluble crystalline structure formation in Xypex-treated concrete. Xypex Crystalline Technology truly has NO EQUAL.
  • London Poster

    Xypex in London

    From the United Kingdom’s tallest building to London’s most luxurious address and a myriad of fascinating structures in-between, Xypex is there, providing products and services to make concrete better.
  • DISTRIBUTOR

    Amr Saad

    Tel: +2 012 222 75 812
    E-mail
  • Register for E-News
Scroll to top