rod el axis bridge

Rod el Farag Axis Bridge

Cairo
More than one million cubic meters of concrete was used to build the bridge, which was used in the bridge decking, girders, and six 92 m (302 ft) tall concrete towers that support 160 steel support cables. One of the key challenges for the bridge designers was how to adequately protect the critical concrete structures from the effects of air pollution and the moist riverine environment.
 
  • admix-brochure

    Admix C-Series

    Xypex Admix is a specialty product that is blended into the concrete at the time of batching. It outperforms other methods because of its unique ability to become a truly integral part of the concrete matrix. Utilizing Xypex’s world-renowned crystalline technology, Xypex Admix seals the primary paths by which water and aggressive chemicals penetrate, attack, and ultimately threaten the long-term integrity of the concrete structure.
  • DISTRIBUTOR

    Amr Saad

    Tel: +2 012 222 75 812
    E-mail
  • Register for E-News
Scroll to top