rod el axis bridge

Rod el Farag Axis Bridge

Cairo
More than one million cubic meters of concrete was used to build the bridge, which was used in the bridge decking, girders, and six 92 m (302 ft) tall concrete towers that support 160 steel support cables. One of the key challenges for the bridge designers was how to adequately protect the critical concrete structures from the effects of air pollution and the moist riverine environment.
 
  • Admix C-1000

    Admix C-500 NF & C-1000 NF

    Xypex Admix is blended into the concrete mix at the time of batching to waterproof and protect concrete from the start. It outperforms other methods because of its unique ability to become a truly integral part of the concrete matrix. The Admix C-Series has been specially formulated to meet varying project and temperature conditions.

    Play Video 
    3
    1f477ff4-4fe6-6432-ba7c-ff0000137baf
  • DISTRIBUTOR

    Amr Saad

    Tel: +2 012 222 75 812
    E-mail
  • Register for E-News
Scroll to top