rod el axis bridge

Rod el Farag Axis Bridge

Cairo
More than one million cubic meters of concrete was used to build the bridge, which was used in the bridge decking, girders, and six 92 m (302 ft) tall concrete towers that support 160 steel support cables. One of the key challenges for the bridge designers was how to adequately protect the critical concrete structures from the effects of air pollution and the moist riverine environment.
 
  • Xypex Coating Installation

    Xypex Coating products, for surface application, are part of the Xypex concrete waterproofing and protection system and represent one of three different ways to install Xypex Crystalline Technology into concrete.
    4
  • Xypex Admix Installation

    Xypex Additive products, added to the concrete at time of batching, are part of the Xypex concrete waterproofing and protection system and represent one of three different ways to install Xypex Crystalline Technology into concrete.
    5
  • Xypex Concrete Repairs

    Xypex provides a number of specialized products for a wide range of concrete repair applications such as stopping flowing water, patching, resurfacing, and rehabilitating concrete as well as the repairing of cracks.
    7
  • DISTRIBUTOR

    Amr Saad

    Tel: +2 012 222 75 812
    E-mail
  • Register for E-News
Scroll to top