xypex Manjung Power Station

Manjung Power Station

Perak

Prior to Xypex, previous efforts at waterproofing this structure had failed. Xypex Concentrate and Patch'n Plug were then selected and applied to remedy extensive cracking in the plant’s concrete and the coal unloading wharf. Xypex successfully repaired cracks and waterproofed and protected the ‘Station’ against chlorides and acidic coal dust.

  • DISTRIBUTOR

    Alex Voon

    RNC Integral Concrete Technology (M) Sdn. Bhd.
    Tel: 03-51928186
    E-mail
  • Register for E-News
Scroll to top