Xypex Admix is blended into the concrete at time of batching enabling companies manufacturing precast products such as manholes, box culverts, pipe, architectural panels and highway median barriers to waterproof their products before they leave the plant.

Project Detail
  • Olympic Games Monument

    Seoul, Korea

    This monument with the Olympic symbol was built for the 1988 Olympic Games in Seoul and is located at the Olympic Park site. A two-coat application of Xypex Concentrate and Modified was applied to all fountain areas surrounding the monument and to foundation walls and slab of a cultural display facility constructed under ground. The total area treated was 4,000 m2 (43,000 sq. ft.).