nigeria-01

EKO Hotel Expansion Project

Victoria Island, Lagos

Xypex was asked to help repair and protect the concrete in the basement parking garage and lift shafts of the EKO Hotel after water leakage caused damage. The basement was built below the water table and is subjected to hydrostatic pressure. The leaks were coming from the floor slab construction joints and most of the edges along the wall to floor and column to floor areas. Xypex Patch'n Plug and Concentrate were used to make these repairs.

  • Projects
    General Construction Foundation

    Covenant University

    Lagos In 2018, Covenant University in Lagos, Nigeria, undertook a significant waterproofing and concrete protection project involving two mathematics halls and a hall of residence. The project utilized Xypex Admix, Xypex Concentrate, and Xypex Modified to ensure the highest level of durability and integrity in the treated areas
    General Construction Foundation

    Egbin Power Station

    Lagos In 2018, the Egbin Power Station in Lagos, Nigeria, undertook a significant construction project involving the stabilization of foundations and the construction of a fence. The project spanned 15 months and was marked by a critical design change midway, requiring the piles to be fabricated on land and then submerged in water. Xypex products were chosen for their proven reliability and ability to meet the project's demanding requirements.
    General Construction Foundation

    Eko Atlantic Water Tank

    Lagos In 2023, the Eko Atlantic project in Lagos, Nigeria, focused on the waterproofing of a concrete water tank, with Lymex Ltd as the contractor. The project aimed to enhance environmental protection, reduce material costs, and extend the service life of the water tank. Utilizing Xypex Concentrate and Xypex Patch'n Plug, the project achieved significant improvements in waterproofing, sustainability, and longevity.
    General Construction Foundation

    EKO Hotel Expansion Project

    Victoria Island, Lagos Xypex was asked to help repair and protect the concrete in the basement parking garage and lift shafts of the EKO Hotel after water leakage caused damage. The basement was built below the water table and is subjected to hydrostatic pressure. The leaks were coming from the floor slab construction joints and most of the edges along the wall to floor and column to floor areas. Xypex Patch'n Plug and Concentrate were used to make these repairs.

  • DISTRIBUTOR

    Lymex Ltd
    Tel: +234 (0) 81 3026 5939