nigeria-01

EKO Hotel Expansion Project

Victoria Island, Lagos

Xypex was asked to help repair and protect the concrete in the basement parking garage and lift shafts of the EKO Hotel after water leakage caused damage. The basement was built below the water table and is subjected to hydrostatic pressure. The leaks were coming from the floor slab construction joints and most of the edges along the wall to floor and column to floor areas. Xypex Patch'n Plug and Concentrate were used to make these repairs.

  • Admix C-1000

    Admix C-500 NF & C-1000 NF

    Xypex Admix is blended into the concrete mix at the time of batching to waterproof and protect concrete from the start. It outperforms other methods because of its unique ability to become a truly integral part of the concrete matrix. The Admix C-Series has been specially formulated to meet varying project and temperature conditions.

    Play Video 
    3
    1f477ff4-4fe6-6432-ba7c-ff0000137baf
  • DISTRIBUTOR

    Stephen Minney

    Tel: +44 (0) 1684 577 756
    E-mail
  • Register for E-News
Scroll to top