1-Enhanced-SR

Εργοστάσιο Παραγωγής Τσιμέντου Ηρακλής

Βόλος

Η προβλήτα Α του εργοστασίου παραγωγής τσιμέντου της LafargeHolcim Ηρακλής στον Βόλο έπρεπε να επισκευαστεί, καθώς η παρουσία θαλασσινού νερού είχε προκαλέσει φθορές στα δομικά της στοιχεία. Η ΕΝΚΑ ΑΕ ανέλαβε τόσο την επισκευή σκυροδέματος, με εκτοξευόμενο σκυρόδεμα, όσο και την αδιαβροχοποίησή του. Μετά τις επισκευές εφαρμόστηκε 1 στρώση Xypex Concentrate σε επιφάνεια περίπου 11.200m2. Χρησιμοποιήθηκαν περισσότερα από 8.000Kg Concentrate.

  • Projects
    Tunnels

    Delhi Metro Rail Corporation (DMRC) Phase III & Phase IV

    Delhi Due to the success of the Xypex surface-applied and repair system in various projects, the Delhi Metro engineering team consulted Xypex to provide a waterproofing solution for phase III. The engineering team specified Xypex Admix C-2000 NF and Xypex Concentrate for the waterproofing of phase III underground stations in conjunction with spray applied membranes on the rooftop slab.
    General Construction Foundation

    Hostivař Apartment House

    Prague
    Xypex Admix was used to waterproof and protect the foundation of this residential building. The waterproofing was carried out in two stages using a total of 4,000 kg of Admix C-1000 NF.
    General Construction Foundation

    “Fokus” Building

    Warsaw Xypex Concentrate was applied to a 133 m strip between the top plate and the sheet pile wall. 
     
    General Construction Foundation

    102 University Avenue

    Palo Alto, California Joseph Bellomo Architects used the crystalline waterproofing and protection features of Xypex in an innovative concrete mix on their new LEED Platinum project in Palo Alto, California. A 70% slag concrete mix combined with Xypex Admix was used for the 3,600 cubic yards required for the six-story building’s façade. 
    General Construction Foundation

    1504 Coney Island Avenue

    Brooklyn, New York With more than 160,000 sq.ft. of space, this brand new retail and office building is the largest in Midwood, Brooklyn, New York. Xypex Admix C-500 was used to waterproof and protect 4,000 cu.yds. of the below grade foundation. Three months after the foundation was completed, all of the areas were dry and to date, Xypex has been performing to the owner’s and engineers’ expectations. 
     
    Water Holding Structures

    19th St. Water Tank

    Denver, Colorado When this set of precast modules changed from overflow to water holding use, Xypex Concentrate and Modified were chosen to create a 2,550 sq. ft. watertight structure. 
     
    Water Holding Structures

    21st Century Tower

    Dubai This tower is the tallest residential building in the region. Xypex was used to waterproof and protect the underground water tanks.
    General Construction Foundation

    313@Somerset

    Engineers, Meinhardt Infrastructure, faced many design challenges including a canal that ran through the centre of the building site, a very high water table and greatly elevated sulphate levels in the surrounding soils.
    General Construction Foundation

    327 Royal Palm

    Boca Raton, Florida Due to the high density of population, and restrictions on construction, this below grade foundation concrete placements have to be done in multiple segments. The last picture is the application of Xypex Concentrate slurry prior to installation of the Miraseal water stop. Recommended construction joint details when using the Xypex admixture. 
     
    General Construction Foundation

    409 and 499 Illinois

    San Francisco, California With an especially high water table at 8 feet below grade, the possibility of saltwater attack, and a garage design calling for two parking levels at 30-ft below grade, Xypex Admix C-1000 NF was specified to waterproof and protect the below-grade slabs and perimeter walls.
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100101102103104105106107108109110111112113114115
  • Εμπορικός Αντιπρόσωπος

    Michael Karantzikis

    ENKA Structural Services SA
    Tel: 210-2583120
    E-mail
  • Register for E-News
Scroll to top