Concrete Waterproofing
by Crystallization™
Menu
region
Select a country
Distributor Login
Distributor Login
/
Projects
/
Project Search
/
Detail
Search by Country
select
All
Albania
Argentina
Australia
Austria
Bangladesh
Barbados
Belgium
Bermuda
Bosnia & Herzegovina
Brazil
Bulgaria
Cambodia
Canada
Caribbean Islands
Cayman Islands
Chile
China
Colombia
Costa Rica
Croatia
Cyprus
Cyprus-Greek
Cyprus-Turkish
Czech Republic
Denmark
Dominican Republic
Ecuador
Egypt
Egypt-Arabic
Egypt-English
Estonia
Ethiopia & Djibouti
Finland
France
Georgia
Germany
Ghana
Greece
Guam
Guatemala
Honduras
Hong Kong
Hong Kong-Chinese
Hong Kong-English
Hungary
Iceland
India
Indonesia
Indonesia-English
Indonesia-Indonesian
Ireland
Israel
Italy
Japan
Kenya
Korea
Kosovo
Kuwait
Latvia
Lithuania
Macau
Malaysia
Malaysia-English
Malaysia-Malay
Maldives
Mexico
Monaco
Mongolia
Montenegro
Morocco
Nepal
Netherlands
New Zealand
Nicaragua
Nigeria
North Macedonia
Norway
Oman
Pakistan
Panama
Papua New Guinea
Peru
Philippines
Philippines-English
Philippines-Tagalog
Poland
Portugal
Puerto Rico
Qatar
Qatar-Arabic
Qatar-English
Romania
Russia
Rwanda
Saudi Arabia
Senegal
Serbia
Sierra Leone
Singapore
Slovakia
Slovenia
South Africa
Spain
Sri Lanka
Sudan
Switzerland
Taiwan
Tanzania
Thailand
Thailand-English
Thailand-Thai
Tunisia
Tunisia-Arabic
Tunisia-French
Turkey
Uganda
Ukraine
United Arab Emirates
United Arab Emirates-Arabic
United Arab Emirates-English
United Kingdom
USA
Venezuela
Vietnam
Vietnam-English
Vietnam-Vietnamese
by Market Segment
select
General Construction Foundation
Bridges
Dams & Irrigation
Marine Structures
Miscellaneous
Power & Utilities
Precast Structures
Tunnels
Wastewater Collection & Treatment
Water Holding Structures
Water Treatment Plants
Industrial Structures
Agriculture
Mining
by Keyword
Project Detail
General Construction Foundation
Marie-Victorin Park Multisport Complex
Saint-Bruno-de- Montarville, Canada
» Download
The project includes pools, basins, elevator pits, and associated concrete structures requiring durable waterproofing and long-term protection against water exposure. During construction, certain critical areas including elevator pits and technical pits required a reliable waterproofing solution following the removal of membrane systems in select locations. These areas required a repair and waterproofing approach that could restore concrete integrity while maintaining constructability and long-term durability.
To address these conditions, Xypex Admix C-500 NF crystalline waterproofing admixture was specified for the elevator pit concrete structures, with approximately 130 m
3
of treated concrete placed. In addition, Xypex repair materials including Xypex Patch’n Plug, Xypex Megamix II, and Xypex Concentrate were used to address honeycombing, surface defects, and joint details in accordance with the project drawings and specifications. The use of the Xypex system provided an integrated crystalline waterproofing solution while reducing reliance on surface membranes and supporting long term durability of the treated concrete elements. The selected approach helps maintain the performance and service life of critical structural components within the Marie-Victorin Park Multisport Complex.
BACK
Also in this section
Scroll to top
↑