Project Detail
  • Anora Process Water Pool

    Koskenkorva rea, Finland

    Following this, the reinforcement was inspected and treated with appropriate corrosion protection.  Subsequently, the structures were rebuilt using sprayed concrete. An initial layer was applied to approximately 15 mm below the final surface level, followed by a finishing layer of approximately 15 mm using sprayed concrete with Megamix II with Bio-San to achieve the required surface profile and durability.

    BACK

Scroll to top