Concrete Waterproofing
by Crystallization™
Menu
region
Select a country
Distributor Login
Distributor Login
/
Projects
/
Project Search
/
Detail
Search by Country
select
All
Albania
Argentina
Australia
Austria
Bangladesh
Barbados
Belgium
Bermuda
Bosnia & Herzegovina
Brazil
Bulgaria
Cambodia
Canada
Caribbean Islands
Cayman Islands
Chile
China
Colombia
Costa Rica
Croatia
Cyprus
Cyprus-Greek
Cyprus-Turkish
Czech Republic
Denmark
Dominican Republic
Ecuador
Egypt
Egypt-Arabic
Egypt-English
Estonia
Ethiopia & Djibouti
Finland
France
Georgia
Germany
Ghana
Greece
Guam
Guatemala
Honduras
Hong Kong
Hong Kong-Chinese
Hong Kong-English
Hungary
Iceland
India
Indonesia
Indonesia-English
Indonesia-Indonesian
Ireland
Israel
Italy
Japan
Kenya
Korea
Kosovo
Kuwait
Latvia
Lithuania
Macau
Malaysia
Malaysia-English
Malaysia-Malay
Maldives
Mexico
Monaco
Mongolia
Montenegro
Morocco
Nepal
Netherlands
New Zealand
Nicaragua
Nigeria
North Macedonia
Norway
Oman
Pakistan
Panama
Papua New Guinea
Peru
Philippines
Philippines-English
Philippines-Tagalog
Poland
Portugal
Puerto Rico
Qatar
Qatar-Arabic
Qatar-English
Romania
Russia
Rwanda
Saudi Arabia
Senegal
Serbia
Sierra Leone
Singapore
Slovakia
Slovenia
South Africa
Spain
Sri Lanka
Sudan
Switzerland
Taiwan
Tanzania
Thailand
Thailand-English
Thailand-Thai
Tunisia
Tunisia-Arabic
Tunisia-French
Turkey
Uganda
Ukraine
United Arab Emirates
United Arab Emirates-Arabic
United Arab Emirates-English
United Kingdom
USA
Venezuela
Vietnam
Vietnam-English
Vietnam-Vietnamese
by Market Segment
select
General Construction Foundation
Bridges
Dams & Irrigation
Marine Structures
Miscellaneous
Power & Utilities
Precast Structures
Tunnels
Wastewater Collection & Treatment
Water Holding Structures
Water Treatment Plants
Industrial Structures
Agriculture
Mining
by Keyword
Project Detail
General Construction Foundation
Behavioral Health Institute – New Forensic Unit
Las Vegas, New Mexico, USA
» Download
The approximately 115,000 square foot facility is designed to provide a modern, secure treatment environment while supporting long-term operational efficiency and enhanced safety. The project includes extensive below grade construction requiring durable concrete protection against groundwater infiltration. Given the critical nature of the facility and long service life expectations, the design team selected an integrated waterproofing solution to enhance concrete durability and reduce future maintenance needs.
Approximately 1,100 cubic yards of concrete incorporating Xypex Admix C-500 were placed for below grade structures. Added at the time of batching, the crystalline admixture reacts with moisture and unhydrated cementitious materials to form insoluble crystals that reduce permeability and limit water ingress throughout the concrete section. The use of Xypex Admix C-500 provided permanent, through section waterproofing protection without reliance on surface applied membranes. This approach supports long term durability, minimizes lifecycle maintenance requirements, and contributes to reliable performance of critical healthcare infrastructure.
BACK
Also in this section
Scroll to top
↑