Concrete Waterproofing
by Crystallization™
Menu
region
Select a country
Distributor Login
Distributor Login
/
Projects
/
Project Search
/
Detail
Search by Country
select
All
Argentina
Australia
Austria
Bangladesh
Barbados
Belgium
Bermuda
Bosnia & Herzegovina
Brazil
Bulgaria
Cambodia
Canada
Caribbean Islands
Cayman Islands
Chile
China
Colombia
Costa Rica
Croatia
Cyprus
Cyprus-Greek
Cyprus-Turkish
Czech Republic
Denmark
Dominican Republic
Ecuador
Egypt
Egypt-Arabic
Egypt-English
Estonia
Ethiopia & Djibouti
Finland
France
Georgia
Germany
Ghana
Greece
Guam
Guatemala
Honduras
Hong Kong
Hong Kong-Chinese
Hong Kong-English
Hungary
Iceland
India
Indonesia
Indonesia-English
Indonesia-Indonesian
Ireland
Israel
Italy
Japan
Kenya
Korea
Kosovo
Kuwait
Latvia
Lithuania
Macau
Malaysia
Malaysia-English
Malaysia-Malay
Maldives
Mexico
Monaco
Mongolia
Montenegro
Morocco
Nepal
Netherlands
New Zealand
Nicaragua
Nigeria
North Macedonia
Norway
Oman
Pakistan
Panama
Papua New Guinea
Peru
Philippines
Philippines-English
Philippines-Tagalog
Poland
Portugal
Puerto Rico
Qatar
Qatar-Arabic
Qatar-English
Romania
Russia
Saudi Arabia
Senegal
Serbia
Sierra Leone
Singapore
Slovakia
Slovenia
South Africa
Spain
Sri Lanka
Sudan
Switzerland
Taiwan
Tanzania
Thailand
Thailand-English
Thailand-Thai
Tunisia
Tunisia-Arabic
Tunisia-French
Turkey
Uganda
Ukraine
United Arab Emirates
United Arab Emirates-Arabic
United Arab Emirates-English
United Kingdom
USA
Venezuela
Vietnam
Vietnam-English
Vietnam-Vietnamese
by Market Segment
select
General Construction Foundation
Bridges
Dams & Irrigation
Marine Structures
Miscellaneous
Power & Utilities
Precast Structures
Tunnels
Wastewater Collection & Treatment
Water Holding Structures
Water Treatment Plants
Industrial Structures
Agriculture
Mining
by Keyword
Project Detail
Wastewater Collection & Treatment
City of Fargo Wastewater Collection & Treatment
Fargo, North Dakota, USA
» Download
The City of Fargo's sewer extension project involved the installation of 1 wet well, 6 units of 6-foot diameter manholes, and over 14 components of sewer lines and lift stations. Bio-San was specified for the project to protect the concrete from MIC (Microbial-Induced Corrosion), harmful chemicals, and water penetration.
Approximately 80 cubic yards of Bio-San was used, with the precast structures produced at Rinker's Plant in Hawley. Bio-San is designed to provide exceptional protection for concrete and rebars in environments prone to degradation. One of its primary functions is to combat Microbial-Induced Corrosion (MIC), a major concern in concrete sanitary sewer systems.
MIC occurs when Thiobacillus bacteria thrive in the air and react to concrete, leading to accelerated deterioration. Bio-San mitigates this risk by incorporating advanced microbial resistance, effectively creating a barrier that prevents bacterial growth and reduces the potential for corrosion. In addition to microbial protection, Bio-San also uses crystalline waterproofing technology, which is crucial for guarding against the damaging effects of sulphates, chlorides, and water penetration.
This technology forms insoluble crystals inside the concrete, filling capillary pores and blocking water pathways. As a result, the concrete is less susceptible to sulphate attack (which can weaken and crack concrete) and chloride penetration (which can corrode steel reinforcement), ensuring the long-term durability of the structures even in harsh, corrosive environments.
An added benefit of using Bio-San is its distinctive brown tint. This visual marker made it easy for officials to identify Bio-San-infused concrete on-site, significantly simplifying the field verification process. Project Manager Jason Satterlund (City of Fargo) noted the color difference when Bio-San-treated products were removed from the truck and placed in front of the non-Bio-San-treated structures, as seen in the images. This visible color contrast made it easier for inspectors, to confirm that the correct additives were used. It served as a simple yet effective quality control tool, providing confidence in the materials used throughout the project. Overall, Bio-San contributed significantly to the project's success, providing both durability and ease of verification throughout the installation process.
BACK
Also in this section
Scroll to top
↑