Concrete Waterproofing
by Crystallization™
Menu
region
Select a country
Distributor Login
Distributor Login
/
Projects
/
Project Search
/
Detail
Search by Country
select
All
Argentina
Australia
Austria
Bangladesh
Barbados
Belgium
Bermuda
Bosnia & Herzegovina
Brazil
Bulgaria
Cambodia
Canada
Caribbean Islands
Cayman Islands
Chile
China
Colombia
Costa Rica
Croatia
Cyprus
Cyprus-Greek
Cyprus-Turkish
Czech Republic
Denmark
Dominican Republic
Ecuador
Egypt
Egypt-Arabic
Egypt-English
Estonia
Ethiopia & Djibouti
Finland
France
Georgia
Germany
Ghana
Greece
Guam
Guatemala
Honduras
Hong Kong
Hong Kong-Chinese
Hong Kong-English
Hungary
Iceland
India
Indonesia
Indonesia-English
Indonesia-Indonesian
Ireland
Israel
Italy
Japan
Kenya
Korea
Kosovo
Kuwait
Latvia
Lithuania
Macau
Malaysia
Malaysia-English
Malaysia-Malay
Maldives
Mexico
Monaco
Mongolia
Montenegro
Morocco
Nepal
Netherlands
New Zealand
Nicaragua
Nigeria
North Macedonia
Norway
Oman
Pakistan
Panama
Papua New Guinea
Peru
Philippines
Philippines-English
Philippines-Tagalog
Poland
Portugal
Puerto Rico
Qatar
Qatar-Arabic
Qatar-English
Romania
Russia
Saudi Arabia
Senegal
Serbia
Sierra Leone
Singapore
Slovakia
Slovenia
South Africa
Spain
Sri Lanka
Sudan
Switzerland
Taiwan
Tanzania
Thailand
Thailand-English
Thailand-Thai
Tunisia
Tunisia-Arabic
Tunisia-French
Turkey
Uganda
Ukraine
United Arab Emirates
United Arab Emirates-Arabic
United Arab Emirates-English
United Kingdom
USA
Venezuela
Vietnam
Vietnam-English
Vietnam-Vietnamese
by Market Segment
select
General Construction Foundation
Bridges
Dams & Irrigation
Marine Structures
Miscellaneous
Power & Utilities
Precast Structures
Tunnels
Wastewater Collection & Treatment
Water Holding Structures
Water Treatment Plants
Industrial Structures
Agriculture
Mining
by Keyword
Project Detail
General Construction Foundation
Renovation of the Belvédère Swimming Pool
Tunis, Tunisia
» Download
The Belvédère Municipal Swimming Pool in Tunis, Tunisia, underwent a significant renovation in 2024, blending modern infrastructure improvements with the preservation of a historic landmark. Owned by the Tunis Municipality and supervised by the General Directorate of Military Engineering, the project brought together an expert engineering team comprising consulting engineers Mr. Fredj and Mr. Adel Maatouk, Bicotec Ingénierie under the leadership of Rachid Nouri, and BIAT & Veritas Tunisia.
Execution was managed by SBF Société Bouzguenda Frères, while ready-mix concrete was supplied by Job Beton. Le Record provided its guidance on the waterproofing technology. This renovation project required an approach that respected the site’s distinctive Art Nouveau floral-shaped columns and overall historical character. With a structural grid spanning 5 meters and a total surface coverage of 2,000 square meters, bridging classic elegance with modern functionality.
Xypex crystalline waterproofing was selected for its ability to provide lasting protection against water ingress, chlorides, and other harmful chemicals. The system’s catalytic reaction forms non-soluble crystals within concrete pores, capillaries, and microcracks, thereby reducing permeability, enhancing the resistance against harmful chemicals, such as chlorides. Additionally, whenever moisture is present within the concrete matrix, Xypex reactivates to generate additional crystals, enabling it to self-heal new hairline cracks that may appear and extending the structure’s durability.
The project used a Xypex system solution to ensure comprehensive waterproofing and structural integrity: 3.2 tonnes of Xypex Admix C-1000 NF were incorporated directly into the concrete mix, providing integral protection at the point of placement; 1.5 tonnes of Xypex Concentrate, a surface-applied slurry, reinforced critical joints and existing structures; 0.8 tonnes of Xypex Patch’n Plug shut tie holes, and small repairs.
These combined applications overcame the unique challenges posed by continuous exposure to chlorides and the high-water table—making the structure susceptible to both water ingress and egress. In these conditions, Xypex’s integral waterproofing approach was especially effective, as it waterproofs when applied on the positive and negative sides and eliminates the risks of peeling, degradation, and mechanical damage associated with traditional coatings and membrane-based systems. The result is a durable, watertight facility that will require minimal maintenance over its lifetime, underscoring the long-term cost efficiency and environmental benefits of self-healing concrete technologies.
Ultimately, the Belvédère Municipal Swimming Pool renovation exemplifies how advanced engineering solutions can revitalize a cherished urban landmark while preserving its historical essence. It remains a testament to Tunis’s cultural heritage and a model for sustainable infrastructure upgrades—maintaining aesthetic refinement, extending service life, and showcasing the proven performance of Xypex crystalline waterproofing.
BACK
Also in this section
Scroll to top
↑