Concrete Waterproofing
by Crystallization™
Menu
region
Select a country
Distributor Login
Distributor Login
/
Projects
/
Project Search
/
Detail
Search by Country
select
All
Argentina
Australia
Austria
Bangladesh
Barbados
Belgium
Bermuda
Bosnia & Herzegovina
Brazil
Bulgaria
Cambodia
Canada
Caribbean Islands
Cayman Islands
Chile
China
Colombia
Costa Rica
Croatia
Cyprus
Cyprus-Greek
Cyprus-Turkish
Czech Republic
Denmark
Dominican Republic
Ecuador
Egypt
Egypt-Arabic
Egypt-English
Estonia
Ethiopia & Djibouti
Finland
France
Georgia
Germany
Ghana
Greece
Guam
Guatemala
Honduras
Hong Kong
Hong Kong-Chinese
Hong Kong-English
Hungary
Iceland
India
Indonesia
Indonesia-English
Indonesia-Indonesian
Ireland
Israel
Italy
Japan
Kenya
Korea
Kosovo
Kuwait
Latvia
Lithuania
Macau
Malaysia
Malaysia-English
Malaysia-Malay
Maldives
Mexico
Monaco
Mongolia
Montenegro
Morocco
Nepal
Netherlands
New Zealand
Nicaragua
Nigeria
North Macedonia
Norway
Oman
Pakistan
Panama
Papua New Guinea
Peru
Philippines
Philippines-English
Philippines-Tagalog
Poland
Portugal
Puerto Rico
Qatar
Qatar-Arabic
Qatar-English
Romania
Russia
Saudi Arabia
Senegal
Serbia
Sierra Leone
Singapore
Slovakia
Slovenia
South Africa
Spain
Sri Lanka
Sudan
Switzerland
Taiwan
Tanzania
Thailand
Thailand-English
Thailand-Thai
Tunisia
Tunisia-Arabic
Tunisia-French
Turkey
Uganda
Ukraine
United Arab Emirates
United Arab Emirates-Arabic
United Arab Emirates-English
United Kingdom
USA
Venezuela
Vietnam
Vietnam-English
Vietnam-Vietnamese
by Market Segment
select
General Construction Foundation
Bridges
Dams & Irrigation
Marine Structures
Miscellaneous
Power & Utilities
Precast Structures
Tunnels
Wastewater Collection & Treatment
Water Holding Structures
Water Treatment Plants
Industrial Structures
Agriculture
Mining
by Keyword
Project Detail
Las Esclusas Wastewater Treatment Plant (PTAR)
Guayaquil, Ecuador
» Download
Originally, the project team had specified an elastomeric membrane system for waterproofing the concrete structures. However, as the project advanced, the need for a more reliable, long-lasting solution became clear. The aggressive nature of the wastewater, coupled with the importance of long-term infrastructure resilience, required a system that could provide superior protection with minimal maintenance. This led to a re-evaluation of the waterproofing strategy.
After technical consultations among project engineers, the decision was made to replace the elastomeric membrane with Xypex Crystalline Technology. This shift was driven by Xypex's proven ability to deliver long-term waterproofing and its capacity to resist aggressive agents found in wastewater. Xypex’s crystalline technology not only extends the life of the concrete structures but also offers a more cost-effective, time-efficient, and sustainable solution compared to the membrane system.
The transition to Xypex was further justified by the local availability of the product, unlike the membrane that had to be imported, thus reducing both costs and logistical complexities. The Xypex products used, Xypex Patch n’ Plug and Xypex Concentrate, ensured long-term integrity and waterproofing of the plant. A total of 11,730 kg of Xypex products were applied across the facility.
The application of Xypex not only met the technical requirements but also underscored the importance of using a system that could guarantee the durability and safety of such a vital infrastructure project. Xypex has no Volatile Organic Compounds (VOCs), no Red-List Chemicals, and has up to 65% less carbon footprint than membranes. Additionally, the plant is equipped with features such as the capacity to treat methane gas emitted from wastewater, generating energy that supplies 40% of the plant's consumption.
These aspects highlight the project’s commitment to sustainability and operational efficiency. While the Las Esclusas PTAR is now fully operational, contributing to the environmental health of the region, the city's commitment to enhancing wastewater management continues. The Guayaquil Municipal Water and Sewer Company EMAPAG-EP is developing another wastewater treatment plant, the Los Merinos PTAR, which is still under construction.
Xypex has been specified for this new plant as well, ensuring that the high standards of waterproofing and durability established at Las Esclusas will be carried forward. The choice to switch from an elastomeric membrane system to Xypex at Las Esclusas not only solved immediate waterproofing challenges but also set a new benchmark for infrastructure projects in the region. This decision shows how innovative solutions can drive long-term success and sustainability in critical public works.
BACK
Also in this section
Scroll to top
↑