Concrete Waterproofing
by Crystallization™
Menu
region
Select a country
Distributor Login
Distributor Login
/
Projects
/
Project Search
/
Detail
Search by Country
select
All
Argentina
Australia
Austria
Bangladesh
Barbados
Belgium
Bermuda
Bosnia & Herzegovina
Brazil
Bulgaria
Cambodia
Canada
Caribbean Islands
Cayman Islands
Chile
China
Colombia
Costa Rica
Croatia
Cyprus
Cyprus-Greek
Cyprus-Turkish
Czech Republic
Denmark
Dominican Republic
Ecuador
Egypt
Egypt-Arabic
Egypt-English
Estonia
Ethiopia & Djibouti
Finland
France
Georgia
Germany
Ghana
Greece
Guam
Guatemala
Honduras
Hong Kong
Hong Kong-Chinese
Hong Kong-English
Hungary
Iceland
India
Indonesia
Indonesia-English
Indonesia-Indonesian
Ireland
Israel
Italy
Japan
Kenya
Korea
Kosovo
Kuwait
Latvia
Lithuania
Macau
Malaysia
Malaysia-English
Malaysia-Malay
Maldives
Mexico
Monaco
Mongolia
Montenegro
Morocco
Nepal
Netherlands
New Zealand
Nicaragua
Nigeria
North Macedonia
Norway
Oman
Pakistan
Panama
Papua New Guinea
Peru
Philippines
Philippines-English
Philippines-Tagalog
Poland
Portugal
Puerto Rico
Qatar
Qatar-Arabic
Qatar-English
Romania
Russia
Saudi Arabia
Senegal
Serbia
Sierra Leone
Singapore
Slovakia
Slovenia
South Africa
Spain
Sri Lanka
Sudan
Switzerland
Taiwan
Tanzania
Thailand
Thailand-English
Thailand-Thai
Tunisia
Tunisia-Arabic
Tunisia-French
Turkey
Uganda
Ukraine
United Arab Emirates
United Arab Emirates-Arabic
United Arab Emirates-English
United Kingdom
USA
Venezuela
Vietnam
Vietnam-English
Vietnam-Vietnamese
by Market Segment
select
General Construction Foundation
Bridges
Dams & Irrigation
Marine Structures
Miscellaneous
Power & Utilities
Precast Structures
Tunnels
Wastewater Collection & Treatment
Water Holding Structures
Water Treatment Plants
Industrial Structures
Agriculture
Mining
by Keyword
Project Detail
General Construction Foundation
Flensburg Navy Barrack Conversion
Flensburg, Germany
» Download
The James B.O.N.E GmbH investment group envisioned converting some old navy barrack buildings into a luxury hotel, situated enticingly next to the quay wall.
This conversion, completed on July 30, 2019, by the innovative team of dedicated architects from IGA Haus, structural engineers from Petersen-Ingenieure GmbH, and waterproofing specialists from BAWAX GmbH, among others, represents a remarkable feat of engineering and architectural prowess.
Despite several attempts over the decades, the persistent infiltration of water had led to a considerable amount of corrosion and damage to the concrete resulting in exposed rebar across walls, slabs, and columns. This was compounded by the fact that the basement had water up to a height of 1m and was unused for many years. Concrete testing showed a carbonization depth of up to 18cm and compressive strength ranging from as low as 5 to 45 N/mm² in the concrete cores analyzed.
After extensive technical discussions among the owner, the architects, all engineers, and the concrete technologist, the team decided to abandon the initial plan of using a sealing membrane system in favor of a superior technology with a proven track
record: the unique Xypex Crystalline Technology, capable of creating continuous and robust waterproofing and protection for concrete structures including the extremely deteriorated concrete walls, slabs, and for the new concrete elements like
elevator pits, piles or perimeter walls.
A Xypex system solution composed of Xypex Patch’n Plug, Concentrate and Modified for the treatment of existing concrete and Admix for use in all new
concrete. Xypex Patch’n Plug is a fast-setting hydraulic cement product that was used to halt flowing water within seconds. Xypex Concentrate and Modified, cementitious mixes known for their ability to waterproof from both the positive and
negative sides and for not requiring a dry surface were used to waterproof the existing concrete.
Xypex providing a durable solution to render the concrete waterproof, chemically resistant, and capable of self-healing cracks up to 0.5mm; Xypex Modified, a Xypex Concentrate reinforcer; and Xypex Admix C-Series, a waterproofing admixture added directly to the concrete mix during batching, eliminating the need for post-curing waterproofing membranes or coatings, saving time and money, rendering concrete impermeable to water, resistant to chemicals, and capable of self-healing cracks up to 0.5 mm.
Xypex Patch'n Plug played a crucial role applied to leaking joints and cracks to immediately stop the ingress of water. Subsequently, Xypex Concentrate was used as dry pack in joint and crack repairs. Xypex Concentrate and Modified were then spray-applied to safeguard approximately 2,600 m² of the basement and wall surfaces. Additionally, Xypex Admix C-Series was used in the reprofiling mortar to
address over 900 defects across an area of 1,000 m², with some sections requiring up to 18 cm depth of application.
The successful application of the unique Xypex Crystalline Technology not only addressed the immediate waterproofing needs but also ensured the structural integrity and extended service life of the building’s concrete elements. This value engineering Xypex system solution showcases the innovativeness of the project’s team and the versatility and effectiveness of the Xypex product range.
Opened on July 10, 2020, the hotel stands as a testament to the collaborative effort of engineers, architects, and technologists who leveraged Xypex solutions to breathe new life into a historical structure, ensuring its legacy and functionality for years to
come.
BACK
Also in this section
Scroll to top
↑