Concrete Waterproofing
by Crystallization™
Menu
region
Select a country
Distributor Login
Distributor Login
/
Projects
/
Project Search
/
Detail
Search by Country
select
All
Argentina
Australia
Austria
Bangladesh
Barbados
Belgium
Bermuda
Bosnia & Herzegovina
Brazil
Bulgaria
Cambodia
Canada
Caribbean Islands
Cayman Islands
Chile
China
Colombia
Costa Rica
Croatia
Cyprus
Cyprus-Greek
Cyprus-Turkish
Czech Republic
Denmark
Dominican Republic
Ecuador
Egypt
Egypt-Arabic
Egypt-English
Estonia
Ethiopia & Djibouti
Finland
France
Georgia
Germany
Ghana
Greece
Guam
Guatemala
Honduras
Hong Kong
Hong Kong-Chinese
Hong Kong-English
Hungary
Iceland
India
Indonesia
Indonesia-English
Indonesia-Indonesian
Ireland
Israel
Italy
Japan
Kenya
Korea
Kosovo
Kuwait
Latvia
Lithuania
Macau
Malaysia
Malaysia-English
Malaysia-Malay
Maldives
Mexico
Monaco
Mongolia
Montenegro
Morocco
Nepal
Netherlands
New Zealand
Nicaragua
Nigeria
North Macedonia
Norway
Oman
Pakistan
Panama
Papua New Guinea
Peru
Philippines
Philippines-English
Philippines-Tagalog
Poland
Portugal
Puerto Rico
Qatar
Qatar-Arabic
Qatar-English
Romania
Russia
Saudi Arabia
Senegal
Serbia
Sierra Leone
Singapore
Slovakia
Slovenia
South Africa
Spain
Sri Lanka
Sudan
Switzerland
Taiwan
Tanzania
Thailand
Thailand-English
Thailand-Thai
Tunisia
Tunisia-Arabic
Tunisia-French
Turkey
Uganda
Ukraine
United Arab Emirates
United Arab Emirates-Arabic
United Arab Emirates-English
United Kingdom
USA
Venezuela
Vietnam
Vietnam-English
Vietnam-Vietnamese
by Market Segment
select
General Construction Foundation
Bridges
Dams & Irrigation
Marine Structures
Miscellaneous
Power & Utilities
Precast Structures
Tunnels
Wastewater Collection & Treatment
Water Holding Structures
Water Treatment Plants
Industrial Structures
Agriculture
Mining
by Keyword
Project Detail
Industrial Structures
Sayga Flour Mills Basement
Khartoum North (Bahri), Sudan
Prior to rehabilitation, the project faced increasing number of water infiltration issues which not only jeopardized the building's structural integrity but also threatened the mill's operational efficiency. After careful consideration, Protech Engineering Co. Ltd was appointed as the waterproofing contractor, leveraging their extensive expertise in tackling industrial-scale waterproofing challenges.
To efficiently address the leakage due to the high hydrostatic pressure, the project team chose the unique Xypex Crystalline Technology for its 55 years of proven track record. The cornerstone of this rehabilitation effort was the application of Xypex Concentrate, a cementitious mix known for its exceptional waterproofing capabilities. Xypex Concentrate may be applied on both the positive and negative sides to wet concrete. The Xypex Concentrate renders the concrete permanently waterproofed and chemically resistant, with the added benefit of self-healing cracks up to 0.5 mm, thereby ensuring long-term protection and enhancing the durability of the structure.
The successful application of Xypex Concentrate effectively stopped water infiltration into the building, safeguarded the mill's infrastructure and ensured the continuity of its operations. This project not only underscored the efficacy of Xypex products in industrial applications but also reinforced the reputation of Sayga Flour Mills and DAL Group for upholding the highest standards of excellence.
BACK
Also in this section
Scroll to top
↑