Concrete Waterproofing
by Crystallization™
Menu
region
Select a country
Distributor Login
Distributor Login
/
Projects
/
Project Search
/
Detail
Search by Country
select
All
Argentina
Australia
Austria
Bangladesh
Barbados
Belgium
Bermuda
Bosnia & Herzegovina
Brazil
Bulgaria
Cambodia
Canada
Caribbean Islands
Cayman Islands
Chile
China
Colombia
Costa Rica
Croatia
Cyprus
Cyprus-Greek
Cyprus-Turkish
Czech Republic
Denmark
Dominican Republic
Ecuador
Egypt
Egypt-Arabic
Egypt-English
Estonia
Ethiopia & Djibouti
Finland
France
Georgia
Germany
Ghana
Greece
Guam
Guatemala
Honduras
Hong Kong
Hong Kong-Chinese
Hong Kong-English
Hungary
Iceland
India
Indonesia
Indonesia-English
Indonesia-Indonesian
Ireland
Israel
Italy
Japan
Kenya
Korea
Kosovo
Kuwait
Latvia
Lithuania
Macau
Malaysia
Malaysia-English
Malaysia-Malay
Maldives
Mexico
Monaco
Mongolia
Montenegro
Morocco
Nepal
Netherlands
New Zealand
Nicaragua
Nigeria
North Macedonia
Norway
Oman
Pakistan
Panama
Papua New Guinea
Peru
Philippines
Philippines-English
Philippines-Tagalog
Poland
Portugal
Puerto Rico
Qatar
Qatar-Arabic
Qatar-English
Romania
Russia
Saudi Arabia
Senegal
Serbia
Sierra Leone
Singapore
Slovakia
Slovenia
South Africa
Spain
Sri Lanka
Sudan
Switzerland
Taiwan
Tanzania
Thailand
Thailand-English
Thailand-Thai
Tunisia
Tunisia-Arabic
Tunisia-French
Turkey
Uganda
Ukraine
United Arab Emirates
United Arab Emirates-Arabic
United Arab Emirates-English
United Kingdom
USA
Venezuela
Vietnam
Vietnam-English
Vietnam-Vietnamese
by Market Segment
select
General Construction Foundation
Bridges
Dams & Irrigation
Marine Structures
Miscellaneous
Power & Utilities
Precast Structures
Tunnels
Wastewater Collection & Treatment
Water Holding Structures
Water Treatment Plants
Industrial Structures
Agriculture
Mining
by Keyword
Project Detail
Tunnels
WestConnex M4E Tunnel
Sydney, New South Wales, Australia
» Download
Contractors CPB Samsung John Holland JV chose to use shotcrete treated with Xypex Crystalline Technology for the waterproofing of the tunnel. As typical, the underground excavation was first stabilized with a primary layer of shotcrete for the safety of the excavation.
After that, a layer of Xypex-treated shotcrete was applied directly onto the primary lining, which serves as both the secondary lining and the waterproofing for the tunnel. This portion of the WestConnex project used a total of 5,578 m3 of Xypex- treated shotcrete for these purposes.
Xypex is a unique chemical treatment for the waterproofing, protection, and improvement of concrete. Xypex Admix C-1000/C-1000 NF is added to the concrete mix at the time of batching and consists of various active, proprietary chemicals.
These active chemicals react with the byproducts of cement hydration in the presence of moisture to cause a catalytic reaction. This reaction generates a non-soluble crystalline lattice throughout the pores and capillary tracts of the concrete. This crystalline lattice permanently seals the concrete and prevents the penetration of water.
The incorporation of Xypex Admix C-1000NF proved highly effective. Not only did it provide a permanent waterproofing solution, but it also yielded considerable cost and time savings for the project. The Xypex-treated shotcrete waterproofing system eliminated the need for an additional shotcrete smoothing layer over the primary lining required by sprayed waterproofing membranes. It also eliminated the application of the membrane itself, cutting two additional processes from the tunnel construction.
As a result of the success of the M4E Tunnel project, CPB contractors have continued the use of the Xypex tunnel waterproofing method on future projects.
To learn more on how Xypex Crystalline Waterproofing protects tunnels, please
click here
.
BACK
Also in this section
Scroll to top
↑