Project Detail
  • Dique de Carena Dry Dock

    Puerto Belgrano, Argentina

    Soletanche Bachy, renowned worldwide for their expertise in geotechnical and civil engineering, was retained as the engineering firm and contractor on this dry dock project. Xypex Concentrate and Patch'n Plug were specified and used to rehabilitate the concrete structure and will again be used on two smaller docks later in the year.

    BACK

Scroll to top