Dams & Irrigation Structure Projects 

Xypex products play a key role in the waterproofing of concrete against water leakage, even against extreme hydrostatic pressure. The unique Xypex technology also protects concrete against the effects of sulfate attack and crack or joint failure.

Project Listing
  • Hotel Beore

    Taiwan

    Situated in the picturesque Sun Moon Lake Scenic Area in Taiwan, Hotel Beore is a boutique retreat that artfully combines natural inspiration with architectural elegance. Construction began in January 2021, and after nearly three years of dedicated craftsmanship, the hotel officially opened its doors in October 2023.
  • PACCAR Cab Storage Facility Expansion

    Sainte-Thérèse, QC, Canada

    PACCAR, a leading manufacturer of heavy-duty trucks, expanded its Sainte-Thérèse facility to increase storage capacity for finished cab units. The new addition required durable, watertight concrete construction to protect sensitive industrial components and maintain efficient operations throughout the year. 
  • Sea La Vie Hotel

    Sarandë, Ksamil, Albania

    The Ksamil project is a 4-story hotel with a basement (1200 m²), built very close to the sea. During excavation, salty water was encountered at only 1 m depth, with a foundation 5.5 m below sea level.
  • Hankook Tire Manufacturing Facility – Mat Slab and Foundation

    Clarksville, USA

    The expansion of Hankook Tire’s 2.2 million sq. ft. (≈204,400m²) manufacturing campus in Clarksville, Tennessee, required deep mat foundations capable of supporting heavy industrial loads and continuous vibration from tire production equipment.
  • Saint-Isidore Wastewater Treatment Plant Upgrade

    Saint-Isidore, Canada

    The Municipality of Saint-Isidore initiated an upgrade to its wastewater treatment facility to replace aging infrastructure and comply with updated environmental standards. The modernization involved the construction of new reinforced concrete structures, including a degritter building, a concrete treatment pond, and a pumping station.
  • Picton Main St Pump Station

    Picton, Canada

    On September 1, 2024, the County of Prince Edward completed the construction of a new wastewater pump station in Picton, Ontario. This critical infrastructure project was designed to enhance the municipality's wastewater collection and treatment capabilities. Located near Lake Ontario, the project presented unique waterproofing challenges that demanded innovative solutions. 
  • Xiangyang Sen De Run Su Ling Ting Residence

    Xiangyang, China

    The Xiangyang Sen De Run Su Ling Ting Residence Project is located in the core development zone of Dongjin New District, Xiangyang City, Hubei Province. It is the first high-end residential benchmark project in the region developed under the concept of a “Fourth-Generation Residence.”
  • Plateau Potable Water Reservoir Vaudreuil-Dorion

    Vaudreuil-Dorion, Canada

    The construction of a new potable water reservoir aimed to enhance water storage infrastructure with an emphasis on durability and reliability. A key challenge was ensuring that the reservoir’s watertightness and long-term durability would protect the potable water supply from contamination and leakage while withstanding constant water pressure and environmental stresses.
  • Renovation and Upgrading of the Bardy pool

    Quebec, Canada

    The Réfection et mise aux normes de la piscine Bardy (Rehabilitation and standard’s upgrade) project in Québec aimed to modernize and upgrade the existing municipal pool to meet current safety, hygiene, and accessibility standards. A key challenge was ensuring the long-term waterproofing and protection of the concrete structure, which was exposed to constant water and chemicals. To address this issue, Xypex Admix C-500 was added directly to the concrete mix during the batching process.
  • Saint-Philippe New Wastewater Treatment Plant

    Saint-Philippe, Canada

    The construction of a new wastewater treatment facility in Saint-Philippe presented a significant challenge in ensuring the long-term durability and watertightness of the wet well. The structure is constantly exposed to harsh wastewater conditions, including chemical attack and continuous moisture, making long-term durability and watertightness critical for operational performance. The public estimate for this project was $36.2 million.
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100101102103104105106107108109110111112113114115116117118
Scroll to top